Skip to Content

Request for information

Technical Committee on the Code of Practice for Demolition of Buildings

Technical Committee on the Code of Practice for Demolition of Buildings

(Appointed by the Director of Buildings)

Enquiry:
G/F, Buildings Department Headquarters, North Tower, West Kowloon Government Offices, 11 Hoi Ting Road, Yau Ma Tei, Kowloon
Telephone:
2626 1616
Boards and committees
Date of 1st Appointment Date of Present Appointment Term Expiry Date
Chairman
Mr. HO Chi-shun
CSE/HK&H, Buildings Department
--- --- 31 Dec 2020
Members
Mr. FUNG Man-fai, Ronald
SBS/K3, Buildings Department
--- --- 31 Dec 2020
Mr. LEUNG Ho-yin
Sr Structural Engr/202, ArchSD
5 Feb 2018 5 Feb 2018 31 Dec 2020
Ir. FUNG Kim-ming
Ch Structural Engr 1, Housing Department
24 Apr 2017 19 Dec 2017 31 Dec 2020
Non-official members
Ir. CHUNG Lung-to, George
Representative of HKIE
8 Aug 2014 19 Dec 2017 31 Dec 2020
Ir. CHAN Chi-kong
Representative of HKIE
19 Dec 2017 19 Dec 2017 31 Dec 2020
Mr. LEE Kai-yuen
Representative of HKCA
19 Dec 2017 19 Dec 2017 31 Dec 2020
Mr. LO Cheuk-pui
Representative of HKGBCA
19 Dec 2017 19 Dec 2017 31 Dec 2020
Mr. LO Chun-wai, Dicky
Representative of HKIA
8 Aug 2014 19 Dec 2017 31 Dec 2020
Sr. KUNG Sui-lun
Representative of HKIS
29 Aug 2014 19 Dec 2017 31 Dec 2020
Prof. AU Tak-kwong, Francis
Representative of HKU
19 Dec 2017 19 Dec 2017 31 Dec 2020
Dr. DAI Jian-guo
Representative of PolyU
8 Aug 2014 19 Dec 2017 31 Dec 2020
Dr. HE Xiaoqiao
Representative of CityU
19 Dec 2017 19 Dec 2017 31 Dec 2020
Dr. CHAN Yui-bun, Ben
Representative of HKUST
8 Aug 2014 19 Dec 2017 31 Dec 2020
Secretary:
Senior Structural Engineeer/Heritage1, Buildings Department
Telephone:
2626 1694
Terms of Reference

  1. To collect views and consider any comments or feedback received from the building industry arising from the use of the Code of Practice, relevant advancement in design, technologies and construction methods, and latest relevant overseas regulatory control and standards; and
  2. To advise and make recommendations to the Director of Buildings from time to time on the appropriate measures to be taken in response to item (i) above.
Top